Menu
When you release an attachment, it will be moved to the attachments of this document
The file is being transferred to the server. This could take a while.
The general attachments to the rescue plan
Attachment | Added by | Created at |
---|---|---|
The floor plans | Janne-Juhani Piiparinen | Aug 20, 2018 10:00 AM |
Maintenance handbook for S1 category civil defence shelters and equipment (incl. the operation of the ventilation machine, p. 37) | Keski-Suomen Opiskelija-asuntosäätiö | Mar 22, 2022 11:54 AM |
Calculations for the civil defence shelter | Henri Kettunen | Jul 23, 2021 10:44 AM |
The attachments set for the equipment
Attachment | Added by | Created at |
---|---|---|
Door to the ventilation machine room and the end of the dry riser | Henri Kettunen | Jul 1, 2021 9:40 AM |
Air-conditioning emergency stop | Janne-Juhani Piiparinen | Aug 20, 2018 2:44 PM |
Hand extinguisher | Janne-Juhani Piiparinen | Aug 20, 2018 2:45 PM |
Gathering area | Henri Kettunen | Jul 1, 2021 9:38 AM |
Dry riser to all the floors, next to the stairs | Henri Kettunen | Jul 1, 2021 9:43 AM |
Dry riser door next to the stairs | Henri Kettunen | Jul 1, 2021 9:44 AM |
Door to the heat distribution room in the storage space for bikes on the basement level | Henri Kettunen | Jul 1, 2021 9:40 AM |
Main water cut-off valve | Janne-Juhani Piiparinen | Aug 20, 2018 2:45 PM |
Cancelling a fire alarm | Henri Kettunen | Jul 1, 2021 9:16 AM |
Fire detector | Henri Kettunen | Jul 1, 2021 9:15 AM |
Second fire department standpipe lock, next to the smoke extraction centre | Henri Kettunen | Jul 1, 2021 9:45 AM |
Fire alarm switchboard | Janne-Juhani Piiparinen | Aug 20, 2018 2:44 PM |
Rescue route diagram | Angela Hirvo | Aug 10, 2020 9:05 AM |
Fire department access to the front of the building directly from the driveway | Henri Kettunen | Jul 1, 2021 9:37 AM |
Exit signs along the corridor | Henri Kettunen | Jul 1, 2021 9:15 AM |
Exit stairs | Henri Kettunen | Jul 1, 2021 9:17 AM |
Emergency stairs from the attic | Henri Kettunen | Jul 1, 2021 9:39 AM |
Standpipe locks and a fire siren by the front door | Henri Kettunen | Jul 1, 2021 9:19 AM |
The door to the main swithcboard in the basement | Henri Kettunen | Jul 1, 2021 9:41 AM |
Electricity switchboard | Janne-Juhani Piiparinen | Aug 20, 2018 2:45 PM |
Smoke extraction activation panel | Janne-Juhani Piiparinen | Aug 20, 2018 2:44 PM |
The smoke extractor output | Henri Kettunen | Jul 1, 2021 9:51 AM |
Safety light panel | Janne-Juhani Piiparinen | Aug 20, 2018 2:46 PM |
The main switchboard in the attic | Henri Kettunen | Jul 1, 2021 9:38 AM |
Machinery of the civil defence shelter | Henri Kettunen | Jul 1, 2021 9:42 AM |
Access point to the civil defence shelter in the basement, to the storage space for movables | Henri Kettunen | Jul 1, 2021 9:43 AM |