Menu
When you release an attachment, it will be moved to the attachments of this document
The file is being transferred to the server. This could take a while.

The attachments set for the equipment

Attachment Added by Created at
Thumbnail of Air-conditioning emergency stop and smoke extraction activation switches at the entrances
Air-conditioning emergency stop and smoke extraction activation switches at the entrances
Eero Lesonen Jun 18, 2015 12:31 PM
Thumbnail of The access into the technical areas is signposted
The access into the technical areas is signposted
Eero Lesonen Jun 18, 2015 12:29 PM
Thumbnail of Assembly point
Assembly point
Eero Lesonen Jun 18, 2015 12:27 PM
Thumbnail of Rescue route to the inner courtyard
Rescue route to the inner courtyard
Eero Lesonen Jun 18, 2015 12:28 PM
Thumbnail of Main electrical switchboard in basement B
Main electrical switchboard in basement B
Eero Lesonen Jun 18, 2015 12:30 PM
Thumbnail of The main water cut-off valve in the heat distribution room
The main water cut-off valve in the heat distribution room
Eero Lesonen Jun 18, 2015 12:29 PM